DWD provided planning advice to British Telecom Plc in respect of its proposals for an onshore wind farm at Wolviston, Teesside.

Planning permission was secured in 2011 for five 125 metre high wind turbines with a combined generating capacity of 15 megawatts.  The project formed part of BT’s UK wide renewable energy programme.

DWD was responsible for co-ordinating and preparing the planning application for the development and leading discussions with the local planning authority and key consultees.


Project Overview

DWD provided planning advice to British Telecom Plc in respect of its proposals for an onshore wind farm at Wolviston, Teesside.

Planning permission was secured in 2011 for five 125 metre high wind turbines with a combined generating capacity of 15 megawatts.  The project formed part of BT’s UK wide renewable energy programme.